Warning
Was the warning noticed?
Offer · Heat Protection Check 2027
The Heat Protection Check examines how your existing process worked in two or three real hot periods of summer 2026, what the available evidence shows and what stays open. The result is a practical decision: which weaknesses to fix before 2027. For one site.
No IT connection and no system access required · no personal data · five slots, awarded until the end of 2026
Most sites have heat-protection measures. The check examines whether they were triggered in time, clearly assigned, carried out and recorded on a real hot day, and what the existing documents actually show.
Was the warning noticed?
Was it decided what to do?
Was the task assigned to a responsible role?
Was the measure actually carried out?
Is there a record that holds up?
Each rating is then classified by whether documents support it.
For handing over what exists, the conversation about the hot days and the results call. No IT connection, no sensors, no personal health data. An on-site visit is optional.
Location, operating hours, shift structure and rough headcount per shift.
Existing procedures, records from earlier hot periods and aggregated operating data, where available and in whatever form they exist. Nothing has to be complete.
One conversation about what happened during selected hot periods in summer 2026, from the participants' point of view.
We match DWD warnings for your warning district against operating hours and shifts. Then we classify every statement about the two or three hot periods by its evidence. We do not assume complete historical records.
Documents or records show the action directly, for example an instruction, a confirmation or a log.
Participants describe what happened. That is an indication, not evidence, and is marked as such.
Evidence is missing or allows several readings. Not documented does not mean it did not happen.
Three weeks after the start you receive the review of your site, prioritised changes and a process plan for the 2027 season.
What the available evidence shows, which steps worked, where the response depended on individuals and what stays open.
Each change gets a trigger, a responsible role and a form of confirmation.
For every prioritised change: trigger, responsible role, measure and the confirmation required.
A real heat event from 2026 runs through Lichen, so you can see what the 2027 process could look like.
The check diagnoses opportunities for improvement. Whether a live pilot makes sense for this site is discussed in the results call. Operational effects would only be tested in a live pilot.
One payment, no ongoing contract.
Thirty minutes to check the site, the documents that exist and access to the information. If the check would not give your site anything, we say so in that call.
Or write directly: hi@lichen-health.tech